Detailed Engineering Design & IEE Study of Jugada Budhi Ganga Hydropower Project (20.2 MW)

Client:Department of Electricity Development
Funding Agency: Government of Nepal
Period: July 2019 to July 2022
Consulting Association:Joint Venture of GEOCE Consultants (P) Ltd, Technoquarry & NEDC in association with BEAM Consultants (P) Ltd.
Approx. Value of Services: Total NRs 34,754,900, GEOCE’s part NRs 15,640,000
Professional Staff Input: 118 person months

Salient Details

The consulting service is to conduct feasibility study, detailed engineering design and IEE study of the project (20.1 MW) and prepare study report covering technical, financial, socio-economic, institutional, environmental and any other relevant aspects of project development.

The scope of services is carried out in following components:

⦁ Feasibility study
⦁ Detailed Engineering Design
⦁ IEE study

Feasibility Study

⦁ Data review
⦁ Desk study and field reconnaissance survey, analyze available data and identify data gap of previous study
⦁ Carry out preliminary project layout and configuration based examine alternatives of project component
⦁ Conduct engineering survey (topographical surveys), hydro-metrological surveys and hydrological studies, geological surveys-geological mapping, geophysical investigation, seismic study, construction materials surveys and testing
⦁ Alignment survey of transmission line
⦁ Analysis of field surveys and investigation tests
⦁ Optimization study of project scheme
⦁ Preliminary design of project components
⦁ Conduct economic and financial analysis
⦁ Recommend best feasible alternative for detailed engineering design

Detailed Engineering Design

⦁ Detailed field investigation (hydrological and sediment studies, geotechnical investigations including core drilling, GLOF study, muck disposal survey, power evacuation surveys, transmission line surveys, access road and cross-drainage structure surveys for selected option for detailed engineering design
⦁ Detailed engineering design of civil structures, hydromechanical equipment, electro-mechanical equipment.

Main design features include:
⦁ Diversion Weir (45 m), Intake (side intake), Under sluice, Gravel Trap, Desilting basin, headrace canal (1050 m), headrace tunnel (D-shaped, 3 m dia, 5300 m length), surge tank, surface powe house and tail race canal
⦁ Transmission Line, 33 Kv, single circuit, length 8 km for grid connection to Budhi Ganga Small HEP
⦁ Substation (2 transformers 24200 KVA, 66/33 Kv, 2x 12500 kVA generators, switchyards)
⦁ Detailed drawing
⦁ Detailed cost estimates
⦁ Preparation of tender documents
⦁ Analysis of institutional arrangements for project implementation
⦁ Preparation of Detailed Project Reports

IEE Study (as per EPA, 1997 and EPR, 1998)

⦁ Delineate the project areas to be covered in the IEE study
⦁ Collect baseline environmental condition (physical, biological, socio-economic, and cultural) of the project area
⦁ Identify, examine, and assess project implementation activities of hydropower project, transmission line and substation, access and project road, camp site and office complex, quarry site etc
⦁ Identify and predict key physical, biological, socio-economic, and cultural positive and negative impacts and issues associated with project implementation.
⦁ Identify project affected persons, identify potential areas for resettlement requirements of the displaced families.
⦁ Propose mitigation measures to avoid or minimize potential adverse environmental impacts and suggest enhancement measures to enhance the beneficial impacts.
⦁ Prepare an environmental management plan to implement the proposed mitigation measures
⦁ Prepare environmental monitoring plans
⦁ Prepare IEE report

Consulting Services for Environmental & Social Management Service Provider (ESMSP),
Tanahun Hydropower Project (ADB Loan No 2990/2991-NEP)

Client: Tanahun Hydropower Limited, Nepal Electricity Authority
Funding Agency: Asian Development Bank
Period:July 2019 to July 2024
Consulting Association:ELC Electroconsult S.P.A., Italy – GEOCE Consultants (P) Ltd.
Approx. Value of Services: Total USD 2.848 million – ELC (US$1.73 million) and GEOCE (NRs 123 million)
Professional Staff Input:International – 46 person months, National-320 person months

Salient Details

The consultancy service is to assist the client to implement environmental and social safeguard measures related to the project and its 34 km, 220 kV transmission line project and associated rural development components in the form of the Rural Electrification Program and the Community Development Program.  Tanahun Hydropower Project (TPH) is 140 MW installed capacity reservoir project with a live storage volume of 192.8×106 cubic meters. Main features of THP include

⦁ 140 m high concrete gravity dam on the Seti River with Tower Type intake
⦁ Headrace tunnel of length 1,203 m including power intake, surge shaft, steel lined
⦁ penstock shaft and tunnel, manifold and distribution pipes and draft tunnel
⦁ Underground powerhouse complex divided in power plant and transformer caverns, including two generating units, transformers, GIS equipment, high voltage cables,
⦁ auxiliary systems, main access tunnel and portal building
⦁ Tailrace tunnel and outlet
⦁ 34 km long 220 kV double circuit Transmission lines
⦁ General infrastructure including access roads.

In addition, the project includes community development plan (CDP) for people in hydropower affected area (8 rural and 1 urban municipalities) to recognize benefits from the project with long term engagement and Safeguards (environment and social).

The scope of services comprises of the followings:

⦁ Implementation of
⦁ Fish conservation management plan
⦁ Water release and river safety management plan
⦁ Wildlife conservation and awareness management plan
⦁ Watershed/Forest management plan
⦁ Monitoring of baseline condition, and of the environmental and social changes that occur in the project affected area (impact monitoring)
⦁ Monitoring of both the performance of implementation of environmental protection and social mitigation measures (performance monitoring)
⦁ Updating and implementation of
⦁ Resettlement and Indigenous People Plan
⦁ Gender equality and social inclusion (GESI) Plan
⦁ Preparation and implementation of
⦁ Community Development Plan
⦁ Rural electrification plan with focus on associated social safeguards related tasks