Feasibility Study and EIA of Khimti Those Hydroelectric Project

The consulting assignment of this project was awarded to Energy Infratech Pvt Ltd, India-GEOCE Consultants (P) Ltd Joint Venture in association with Technoquarry and Beam on March 22, 2020. The objective of the consulting services is to carry out feasibility study and environmental impact study of reservoir  type hydroelectric project with installed capacity of 356 MW in Dolakha, Ramecchap districts of Province 3. The project duration is 30 months. The Client is Department of Electricity Development, Government of Nepal.

9 Comments

  • usa online slot deposit bonus

    […] online casinos […]

  • sildenafil online 25mg usa

    […] sildenafil 50mg cost […]

  • cialis in mexico

    […] how much is cialis in mexico […]

  • cialis 2.5

    […] cialis 20mg bottle nongeneric for sale […]

  • viagra 100mg online in india

    […] viagra pfizer 50 mg online […]

  • best casinos bonus

    […] best games at a casino […]

  • sildenafil 25 mg online

    […] viagra 75mg […]

  • daily cialis

    […] buying cialis online […]

  • buy viagra online paypal

    […] buy cialis online canada […]

  • Comments for this post are closed.