Detail Design and Construction Supervision, Air Transport Capacity Enhancement Project (ADB Loan No 2581-NEP (SF) & Grant No. 0181-NEP (SF)

Client: Civil Aviation Authority of Nepal (CAAN)
Funding Agency: Asian Development Bank
Period: April 2010 to June 2017
Consulting Association: Japan Airport Consultants Inc., GEOCE Consultants (P) Ltd
Approx. Value of Services: JAC’s – US$ 3.68 million, GEOCE’s part- NRs 189.91 million
Professional Staff Input: International (120) and National (661) person months

Salient Details

The project will enhance safety and capacity at Tribhuvan International Airport (TIA) and three remote domestic airports-Lukla, Rara and Simikot. TIA’s airfield side infrastructure will be reconfigured and upgraded to international safety standards including provision or construction of (i) about 1,400 meters (m) of new main taxiways and link taxiways, (ii) 300 meters of runway extension and construction of runway end safety area, (iii) new international apron (about 80,000 m2), (v) an uninterrupted power supply system for essential airfield and security area lights, (vi) CNS and ATM equipment, and (vii) upgrading of rescue and firefighting system. TIA’s terminal infrastructure will be reconfigured and expanded. Basic safety improvements at the three remote domestic airports include a visual approach guidance system (VAGS) and abbreviated precision approach path indicator (APAPI) at Lukla airport, and runway threshold identification and runway end lights, CNS/ATM and MET equipment at Simikot and Rara airports. The project cost is about US$ 92 million.  

The consulting services consisted of detail engineering design, procurement of works and equipment, project management assistance and construction supervision of airports upgrading/improvement works. The consulting services were provided in two phases: Design Phase (April to December 2012) and Construction Supervision Phase (September 2012 to March 2017).

The scope of work  included following buildings:

  • Architectural, structural, MEP design and construction supervision for (i) expansion and reconfiguration of international terminal building (departure gate 2000 m2, arrival bus station 240 m2, additional baggage claim 1200 m2, reconfiguration of departure area, check-in counters, immigrations, security check and passenger lounge);
  • Architectural, structural, MEP design of new Domestic Terminal Building (10,000 m2);
  • Architectural, structural and electrical design and construction supervision of Power Stations (P-1 expansion, P-2 relocation, generator house and pump house of water supply.

bl5

bl8 bl7

Development and Implementation of Additional Infrastructures of Tribhuvan International Airport as per TIA Master Plan 2015 (Design and Construction Supervision)

Client: Civil Aviation Authority of Nepal (CAAN)
Funding Agency: CAAN
Period: September 2008 to June 2012
Consulting Association: GEOCE Consultants (P) Ltd, JOSHI Associates JV
Approx. Value of Services: Total NRs 15.92 million, GEOCE’s part- NRs 10.35 million
Professional Staff Input: National (120) person months, GEOCE’s part (110) person months

Salient Details

The Project was to develop additional infrastructures as per TIA Master Plan 2015 to enhance operational capacity of TIA. The consulting assignment was divided into two phases. Phase I: Design Phase comprised design of additional infrastructures – expansion of international apron (second phase); expansion and strengthening of domestic apron; aircraft maintenance base, hangar area and exit taxiways; and temporary domestic terminal building – divided into 4 packages. The cost estimates of these packages were US$ 24 million. This pahse also included preparation of pre-qualification and bid documents. Phase II: Construction Phase comprised of construction supervision of two packages of works (i) Package 1: Expansion of International Aircraft Apron (First Phase) and Equipment Yard  comprising site development, cement concrete pavement, drainage, electrical and other associated works (grease removal and repair of joint sealants from existing apron and equipment stand), NCB contract, FIDIC ; and (ii) Package 2: Runway and Taxiway Overlays comprising hot mix asphalt concrete resurfacing overlays of runway (3050×60 m) and 5 taxiways (total 85,000 sqm), ICB Contract, FIDIC. Total cost of the works contract was about US$ 4.5 million.

The project included design of following building:

  • Architectural, structural, MEP design of temporary terminal building (floor area 8,300 m2). Abundance of natural ventilation and light was emphasized in design.  